Читаем Critical Path полностью

He couldn’t accept his final act would be screaming as they fed him into a meat-processing machine and turned into silver trays of slop. Not that… anything but that.

For the last five minutes, faint sounds drifted across the breeze. He glanced over his shoulder. The trail of croatoans headed into a massive basin. Half of the ten aliens had already disappeared down it.

The sweet odor of the root field quickly changed to a nostril-invading stench. A mixture of cooking meat and dung wafted up from the basin.

Distant noises became clearer: the repeated clank of metal being struck, a dog barking, a rapid rhythmic sound of sawing wood. And then raised human voices, one laughing. Nothing like any farm he’d previously stalked and attacked.

The croatoan slowed as the ground changed from harvested land to a dirt road on a steep incline. Another alien stalked close with its strange bouncing gait and stopped to have a staccato conversation with Charlie’s captor.

Both of their uniforms were old and tatty. The body armor was faded and stained, their visors lacking their usual trademark sheen.

Charlie reached out and gripped the pole, twisting himself around to try to get a better view of his intended destination.

He fully expected a meat-processing warehouse. But the sight surprised him.

Smoke curled into the sky from at least fifty different places from a small town within the basin at least forty meters deep and a couple of kilometers wide.

Croatoans trudged down the dirt road in procession. It cut to the bottom of the basin in a series of shallow switchbacks and ran through the center of the settlement.

Either side of it, a mixture of two hundred or so small buildings with wooden and canvas roofs formed a cluttered surrounding, some with animal pens attached. A scattering of people moved between the individual places.

In the center, a larger building, perched high on a piece of raised ground, glinted in the sun. Charlie shielded his eyes and gasped. Constructed out of debris stone, it reached three stories high and featured a number of glistening metal turrets, completed by solid-looking wooden doors protecting its arched entrance.

Around the perimeter of the basin, a series of five giant steps were cut into the side. Like a stadium for giants. On the left-hand side, twenty or so buildings with more of a modern look nestled on each level, constructed with a mixture of materials.

Some looked like mini warehouses, others like log cabins or adapted trailers. Nothing seemed quite right with each one. The closest mini warehouse had a brick constructed dwarf wall running around the bottom; a cabin had silver window shutters. Several had washing lines out front. The clothing on them flapped in the breeze.

On the steps running around the right-hand side, root spread across the bottom three levels as far as the eye could see. Wheat and barley gently rippled on the upper sections.

A gaping sinkhole lay between the main settlement area and the basin’s left edge. Bigger than any Charlie had previously seen, a dull silver cone protruded out of the left-hand side. He recognized it as one of the initial invasion vessels.

Beyond the chasm, a high stone wall surrounded an area the size of a football field. Visually sweeping the landscape again, he attempted to assimilate the strange configuration. No frame of reference for the mash-up came to mind.

Whatever it was, it had been for some time.

A bearded man dressed in a filthy white apron walked around the side of the nearest building. After throwing the contents of a bucket into a pigpen, he turned and gazed upwards. Charlie raised his hand. The man shook his head, wiped his hands on his apron-front, and returned inside.

The croatoan tugged at the control pole, pulling Charlie to the ground. His heels slipped against the dusty surface as he tried to gain traction.

The alien increased its speed of descent. Charlie’s legs no longer had the strength to maintain a crab-like walk. He grabbed the pole with both hands, lifting his back off the ground, and scraped to the bottom of the incline on the balls of his feet.

A golden retriever bounded up, tail wagging. It panted in Charlie’s face and walked alongside. The croatoan loudly clicked, waving its dusty black glove at the dog until it scampered away. The alien hauled Charlie to his feet and pushed him forward, jabbing the pole into the back of his neck, encouraging him to walk along the two-hundred-yard road through the settlement and toward the main building.

Charlie shuffled forward, stumbling every time he received a thrust from behind. He glanced into the first building on the right. Different cuts of meat hung from hooks on the ceiling. Behind a wooden table, spattered in blood, the man in the filthy apron glared back at him before slamming a cleaver into a pig’s severed leg.

Перейти на страницу:

Похожие книги

Утес чайки
Утес чайки

В МИРЕ ПРОДАНО БОЛЕЕ 30 МИЛЛИОНОВ ЭКЗЕМПЛЯРОВ КНИГ ШАРЛОТТЫ ЛИНК.НАЦИОНАЛЬНЫЙ БЕСТСЕЛЛЕР ГЕРМАНИИ № 1.Шарлотта Линк – самый успешный современный автор Германии. Все ее книги, переведенные почти на 30 языков, стали национальными и международными бестселлерами. В 1999–2023 гг. снято более двух десятков фильмов и сериалов по мотивам ее романов.Несколько пропавших девушек, мертвое тело у горных болот – и ни единого следа… Этот роман – беспощадный, коварный, загадочный – продолжение мирового бестселлера Шарлотты Линк «Обманутая».Тело 14-летней Саскии Моррис, бесследно исчезнувшей год назад на севере Англии, обнаружено на пустоши у горных болот. Вскоре после этого пропадает еще одна девушка, по имени Амели. Полиция Скарборо поднята по тревоге. Что это – дело рук одного и того же серийного преступника? Становится известно еще об одном исчезновении девушки, еще раньше, – ее так и не нашли. СМИ тут же заговорили об Убийце с пустошей, что усилило давление на полицейских.Сержант Кейт Линвилл из Скотланд-Ярда также находится в этом районе, но не по службе – пытается продать дом своих родителей. Случайно она знакомится с отчаявшейся семьей Амели – и, не в силах остаться в стороне, начинает независимое расследование. Но Кейт еще не представляет, с какой жутью ей предстоит столкнуться. Под угрозой ее рассудок – и сама жизнь…«Линк вновь позволяет нам заглянуть глубоко в человеческие бездны». – Kronen Zeitung«И снова настоящий восторг из-под пера королевы криминального жанра Шарлотты Линк». – Hannoversche Allgemeine Zeitung«Шарлотта Линк – одна из немногих мировых литературных звезд из Германии». – Berliner Zeitung«Отличный, коварный, глубокий, сложный роман». – Brigitte«Шарлотте Линк снова удалось выстроить очень сложную, но связную историю, которая едва ли может быть превзойдена по уровню напряжения». – Hamburger Morgenpost«Королева саспенса». – BUNTE«Потрясающий тембр авторского голоса Линк одновременно чарует и заставляет стыть кровь». – The New York Times«Пробирает до дрожи». – People«Одна из лучших писательниц нашего времени». – Journal für die Frau«Мощные психологические хитросплетения». – Focus

Шарлотта Линк

Детективы / Триллер
Дом лжи
Дом лжи

Изощренный, умный и стремительный роман о мести, одержимости и… идеальном убийстве. От автора бестселлеров New York Times. Смесь «Исчезнувшей» и «Незнакомцев в поезде».ЛОЖЬ, СКРЫВАЮЩАЯ ЛОЖЬСаймон и Вики Добиас – богатая, благополучная семья из Чикаго. Он – уважаемый преподаватель права, она – защитница жертв домашнего насилия. Спокойная, счастливая семейная жизнь. Но на самом деле все абсолютно не так, как кажется. На поверхности остается лишь то, что они хотят показать людям. И один из них вполне может оказаться убийцей…Когда блестящую светскую львицу Лорен Бетанкур находят повешенной, тайная жизнь четы Добиас выходит на свет. Их бурные романы на стороне… Трастовый фонд Саймона в двадцать один миллион долларов, срок погашения которого вот-вот наступит… Многолетняя обида Вики и ее одержимость местью… Это лишь вершина айсберга, и она будет иметь самые разрушительные последствия. Но хотя и Вики, и Саймон – лжецы, кто именно кого обманывает? К тому же, под этим слоем лицемерия скрывается еще одна ложь. Поистине чудовищная…«Самое интересное заключается в том, чтобы выяснить, каким частям истории – если таковые имеются – следует доверять. Эллис жонглирует огромным количеством сюжетных нитей, и результат получается безумно интересным. Помогает и то, что почти каждый персонаж в книге по определению ненадежен». – New York Times«Тревожный, сексуальный, влекущий, извилистый и извращенный роман». – Джеймс Паттерсон«Впечатляет!» – Chicago Tribune«Здешние откровения удивят даже самых умных читателей. Сложная история о коварной мести, которая обязательно завоюет поклонников». – Publishers Weekly«Совершенно ослепительно! Хитроумный триллер с дьявольским сюжетом. Глубоко проникновенное исследование жадности, одержимости, мести и справедливости. Захватывающе и неотразимо!» – Хэнк Филлиппи Райан, автор бестселлера «Ее идеальная жизнь»«Головокружительно умный триллер. Бесконечно удивительно и очень весело». – Лайза Скоттолайн«Напряженный, хитрый триллер, который удивляет именно тогда, когда кажется, что вы во всем разобрались». – Р. Л. Стайн

Дэвид Эллис

Триллер