Читаем Critical Path полностью

A pair of shadows moved out of sight.

“Hey, I’m stuck. Help me!”

No response.

The skin on his neck and face prickled with the dawning that they’d abandoned him. Had they led him here on purpose?

The smoke continued to fill the tiny space, making his lungs burn with every breath.

More creaking and rending of metal screeched just beyond the fallen ceiling that pressed Mike against the wall. It sounded like the whole thing would collapse on him, entombing him in alien metal. And he couldn’t even reach his radio, his arms pressed through the gap and the radio crushed behind him, attached to his belt.

Spots began to flash in his vision.

His tight chest made it difficult to breathe, and even then, with each lungful of inhalation, he brought with it the cloying, choking smoke.

“Fuck,” he whispered, closing his eyes as he tried in vain to push back and make some room for himself.

He didn’t know how long he remained in that position, having given up hope he would get out. He thought of Mai and the time they’d spent together. He thought of Charlie and Pippa and their time during the ice age. He saw her face, bright and smiling even though they lived through hell.

A welling-up of grief and sadness made him cough and thrash out his hand through the gap.

He touched something, recoiled his hand and opened his eyes.

“Blinky… help me,” he said as the small engineer looked up at him with wide eyes. For a moment the useless thing just stood there watching, but then, as though finally getting the situation, turned and waved Grumpy back while he ducked out of view. He returned with a pole and passed the end through the bottom of the narrow doorway. He and Grumpy pulled on the other end while Mike leaned his shoulder into the door in an attempt to help.

Nothing budged, despite their efforts.

From just behind the fallen ceiling piece a loud crash came, and the whole ship rocked, jolting the structure. It proved to be useful, however, as with another pull on the pole, the two engineers shifted the door open another foot.

Mike screamed out as he pushed with all he had, driving his shoulder into the door. Something in the mechanism gave, and it finally sprang open, sending Mike crashing forward to the floor with the momentum of his efforts.

The two aliens dropped the pole and dragged him forward.

He spun over just in time to see the door smash closed, just inches from crushing his ankles.

With their help, he managed to stand and regain his balance.

“Thanks, little guys,” Mike said.

They did their blinking and inclined their heads, clicking to each other in short bursts.

With no more exchange of pleasantries, they turned their backs and headed off, consulting a small screen attached to their wrists. They were reading Hagellan’s directions of how to reach the main engine bay’s maintenance section.

Through a dozen more tunnels and levels, twists and tight turns, Mike felt every year of his age in his bones and muscles.

Sweat dripped from his face, and he breathed heavily, wishing he hadn’t volunteered to come along.

Because the engineers were born in Unity, they hadn’t been trained in the proper way of the aliens brought over from their home planet or ones born on the ship. In truth, they weren’t even engineers, Mike just used that term to classify them due to their smaller size compared to the soldiers and the larger still hunters.

With their claw-like hands, they didn’t have the delicate dexterity of humans, especially as they weren’t trained to use the croatoan tools like the original engineers who had perished in the crash and subsequent battles.

Mike’s own tool kit hung around his front in a makeshift sling.

He had no idea if what he had brought would be enough for the task at hand, but if Charlie needed this part to get the ship airborne and stop the threat—if it were real—then Mike would do his best to deal with the situation.

The two aliens stopped in a dark passageway in front of a sheer surface at least two meters high with a meter-high gap at the top.

“Through there?” Mike said, pointing to the gap.

Blink, blink, nod.

Grumpy showed him his screen. A high-res image of a corridor leading to the maintenance room corresponded to what they were looking at now, only this was on an angle and the obstacle in the way appeared to have fallen through the ceiling, blocking access to the tunnel.

“I’ll lift you up,” Mike said, pointing to them and raising his arms.

Blink, blink, nod.

“Right then. Blinky, you first.”

Mike approached cautiously and held back his revulsion as he grabbed the four-foot-tall alien by the waist and lifted it up until it reached out its hands and dragged itself into the gap. “Now you, Grumpy.”

Mike repeated the movement.

Перейти на страницу:

Похожие книги

Утес чайки
Утес чайки

В МИРЕ ПРОДАНО БОЛЕЕ 30 МИЛЛИОНОВ ЭКЗЕМПЛЯРОВ КНИГ ШАРЛОТТЫ ЛИНК.НАЦИОНАЛЬНЫЙ БЕСТСЕЛЛЕР ГЕРМАНИИ № 1.Шарлотта Линк – самый успешный современный автор Германии. Все ее книги, переведенные почти на 30 языков, стали национальными и международными бестселлерами. В 1999–2023 гг. снято более двух десятков фильмов и сериалов по мотивам ее романов.Несколько пропавших девушек, мертвое тело у горных болот – и ни единого следа… Этот роман – беспощадный, коварный, загадочный – продолжение мирового бестселлера Шарлотты Линк «Обманутая».Тело 14-летней Саскии Моррис, бесследно исчезнувшей год назад на севере Англии, обнаружено на пустоши у горных болот. Вскоре после этого пропадает еще одна девушка, по имени Амели. Полиция Скарборо поднята по тревоге. Что это – дело рук одного и того же серийного преступника? Становится известно еще об одном исчезновении девушки, еще раньше, – ее так и не нашли. СМИ тут же заговорили об Убийце с пустошей, что усилило давление на полицейских.Сержант Кейт Линвилл из Скотланд-Ярда также находится в этом районе, но не по службе – пытается продать дом своих родителей. Случайно она знакомится с отчаявшейся семьей Амели – и, не в силах остаться в стороне, начинает независимое расследование. Но Кейт еще не представляет, с какой жутью ей предстоит столкнуться. Под угрозой ее рассудок – и сама жизнь…«Линк вновь позволяет нам заглянуть глубоко в человеческие бездны». – Kronen Zeitung«И снова настоящий восторг из-под пера королевы криминального жанра Шарлотты Линк». – Hannoversche Allgemeine Zeitung«Шарлотта Линк – одна из немногих мировых литературных звезд из Германии». – Berliner Zeitung«Отличный, коварный, глубокий, сложный роман». – Brigitte«Шарлотте Линк снова удалось выстроить очень сложную, но связную историю, которая едва ли может быть превзойдена по уровню напряжения». – Hamburger Morgenpost«Королева саспенса». – BUNTE«Потрясающий тембр авторского голоса Линк одновременно чарует и заставляет стыть кровь». – The New York Times«Пробирает до дрожи». – People«Одна из лучших писательниц нашего времени». – Journal für die Frau«Мощные психологические хитросплетения». – Focus

Шарлотта Линк

Детективы / Триллер
Дом лжи
Дом лжи

Изощренный, умный и стремительный роман о мести, одержимости и… идеальном убийстве. От автора бестселлеров New York Times. Смесь «Исчезнувшей» и «Незнакомцев в поезде».ЛОЖЬ, СКРЫВАЮЩАЯ ЛОЖЬСаймон и Вики Добиас – богатая, благополучная семья из Чикаго. Он – уважаемый преподаватель права, она – защитница жертв домашнего насилия. Спокойная, счастливая семейная жизнь. Но на самом деле все абсолютно не так, как кажется. На поверхности остается лишь то, что они хотят показать людям. И один из них вполне может оказаться убийцей…Когда блестящую светскую львицу Лорен Бетанкур находят повешенной, тайная жизнь четы Добиас выходит на свет. Их бурные романы на стороне… Трастовый фонд Саймона в двадцать один миллион долларов, срок погашения которого вот-вот наступит… Многолетняя обида Вики и ее одержимость местью… Это лишь вершина айсберга, и она будет иметь самые разрушительные последствия. Но хотя и Вики, и Саймон – лжецы, кто именно кого обманывает? К тому же, под этим слоем лицемерия скрывается еще одна ложь. Поистине чудовищная…«Самое интересное заключается в том, чтобы выяснить, каким частям истории – если таковые имеются – следует доверять. Эллис жонглирует огромным количеством сюжетных нитей, и результат получается безумно интересным. Помогает и то, что почти каждый персонаж в книге по определению ненадежен». – New York Times«Тревожный, сексуальный, влекущий, извилистый и извращенный роман». – Джеймс Паттерсон«Впечатляет!» – Chicago Tribune«Здешние откровения удивят даже самых умных читателей. Сложная история о коварной мести, которая обязательно завоюет поклонников». – Publishers Weekly«Совершенно ослепительно! Хитроумный триллер с дьявольским сюжетом. Глубоко проникновенное исследование жадности, одержимости, мести и справедливости. Захватывающе и неотразимо!» – Хэнк Филлиппи Райан, автор бестселлера «Ее идеальная жизнь»«Головокружительно умный триллер. Бесконечно удивительно и очень весело». – Лайза Скоттолайн«Напряженный, хитрый триллер, который удивляет именно тогда, когда кажется, что вы во всем разобрались». – Р. Л. Стайн

Дэвид Эллис

Триллер