Читаем Critical Path полностью

After the translation, the guards talked amongst themselves for a brief moment before looking back at Augustus. He peered along the line of helmets, smiling, nodding his head. “You are the chosen few. The ones that will be remembered in history books. If a croatoan ship returns, they will thank us. If one doesn’t, we will create a new golden era for this planet.”

The little surveyor relayed the final part of his great speech. One alien at the end of the line replied. Augustus leaned down. “What did he say?”

“They’re with you,” the surveyor said.

Augustus took a deep breath, clenched his fists, and smiled. “We have no time to waste. Prepare for travel.”

He jumped from his chair and headed for the pile of root. The wheels were set in motion. Unity would be crushed, and no pompous old woman or ragtag force would stop his well-drilled army.

<p>CHAPTER THIRTY-THREE</p>

Denver yawned. Golden dawn light warmed his eyelids. He turned over and rolled into the warm body of… he opened his eyes.

Maria.

Of course. She’d stayed here when they had returned from the shipwreck.

Temporary amnesia faded. Memories, obscured by sleep and nebulous dreams, sharpened into focus.

They were in their shack on the hills of Unity. Beside his bed was the dark case containing the bomb they’d picked up from Mai late yesterday evening.

Muted snoring susurrated through the thin walls. He knew that particular sleep-song belonged to his dad—the soundtrack of fatigue and a day’s good work.

Maria’s breathing came in steady lapping tides, warming his shoulder. She had her knees up to her chest, her arms around the sagging pillow.

A stray lock of hair had fallen across her face and flittered with each exhalation.

The filtered glow of the room brought vitality to her face.

For such a long time she had appeared, on the surface, to be at peace.

Lately, over the last few weeks, she had seemed to be struggling with some inner torment.

Denver had tried a few times to ask her what was going on, but she wouldn’t open up, and he didn’t have the words or skill to pick that particular lock.

Because she had just gotten on with things, he supposed they had all taken for granted how well she was coping.

Beneath the exterior of strength, there lay an insidious weakness. He reached a hand over to draw the hair from her face.

She stirred and brought her hand up touching Denver’s. She opened her eyes lazily and froze as their gazes locked onto each other.

Her body stiffened. She eased away. “Oh, hey,” she said. “Um, morning.”

Denver pulled his hand away and sat up in the bed, letting the blanket fall. Maria clutched it to her body.

“I’m sorry,” Denver said. “I didn’t mean to wake you… I just, well, how are you feeling?”

Maria yawned. “Weird… I need to talk to you. It’s about Hagellan. He can’t be trusted.”

A sharp rap on the door interrupted them. “Come on, kiddos, we got work to do.”

“Be right there, Dad,” said Denver. Then to Maria: “Sorry, we’ll talk, let’s just get this out of the way first.”

“Okay,” Maria said. “But it’s important.”

* * *

Mike and Charlie sat around the rickety coffee table, the salvaged parts spread out on the surface. A croatoan engineer garbled in broken English as it and Mike discussed the next stage of the operation.

Maria stepped out from behind Denver and greeted the others, the veneer of calm now fully in place. A practiced phenotype designed to act as camouflage.

Charlie gave Denver a knowing look with a micro-expression raise of his eyebrow. Denver shook his head a few millimeters, indicating that, no, he didn’t sleep with Maria. He caught a hint of disappointment in his father’s face. Denver wasn’t stupid; he knew his dad would prefer him to be with Maria instead of Layla, but right now, that issue wasn’t high on his list of priorities.

Mike stood and gathered the parts. “So this is it. If these work as well as my new friend here thinks, we should be good to go later today.”

“We go,” the alien said, tugging on Mike’s sleeve.

“We’ll catch up with your progress later,” Charlie said, striding across the room and opening the door for him. The guard outside gave a curt nod.

“Okay,” Mike said, looking weary as though he’d been up all night going through the installation process with his alien counterpart. “Proof is in the pudding and all that. Let’s hope all this works out.”

“With you on the case, Mike, I have no doubt,” Denver said, clapping the man he thought of as his uncle on the shoulder. If anyone had the ability to do this, it was Mike. Growing up, Denver had seen him do some spectacular things with the remnants of human technology and engineering.

The alien stepped outside, and Mike followed, carrying the bundle of parts. The guard escorted them. Denver watched from the open door as they descended the steps and headed for Hagellan’s craft. Apparently they’d towed it to Unity with a harvester last night. They weren’t messing around either.

Aimee approached from the direction of town, flanked by two shotgun-wielding croatoans.

Перейти на страницу:

Похожие книги

Утес чайки
Утес чайки

В МИРЕ ПРОДАНО БОЛЕЕ 30 МИЛЛИОНОВ ЭКЗЕМПЛЯРОВ КНИГ ШАРЛОТТЫ ЛИНК.НАЦИОНАЛЬНЫЙ БЕСТСЕЛЛЕР ГЕРМАНИИ № 1.Шарлотта Линк – самый успешный современный автор Германии. Все ее книги, переведенные почти на 30 языков, стали национальными и международными бестселлерами. В 1999–2023 гг. снято более двух десятков фильмов и сериалов по мотивам ее романов.Несколько пропавших девушек, мертвое тело у горных болот – и ни единого следа… Этот роман – беспощадный, коварный, загадочный – продолжение мирового бестселлера Шарлотты Линк «Обманутая».Тело 14-летней Саскии Моррис, бесследно исчезнувшей год назад на севере Англии, обнаружено на пустоши у горных болот. Вскоре после этого пропадает еще одна девушка, по имени Амели. Полиция Скарборо поднята по тревоге. Что это – дело рук одного и того же серийного преступника? Становится известно еще об одном исчезновении девушки, еще раньше, – ее так и не нашли. СМИ тут же заговорили об Убийце с пустошей, что усилило давление на полицейских.Сержант Кейт Линвилл из Скотланд-Ярда также находится в этом районе, но не по службе – пытается продать дом своих родителей. Случайно она знакомится с отчаявшейся семьей Амели – и, не в силах остаться в стороне, начинает независимое расследование. Но Кейт еще не представляет, с какой жутью ей предстоит столкнуться. Под угрозой ее рассудок – и сама жизнь…«Линк вновь позволяет нам заглянуть глубоко в человеческие бездны». – Kronen Zeitung«И снова настоящий восторг из-под пера королевы криминального жанра Шарлотты Линк». – Hannoversche Allgemeine Zeitung«Шарлотта Линк – одна из немногих мировых литературных звезд из Германии». – Berliner Zeitung«Отличный, коварный, глубокий, сложный роман». – Brigitte«Шарлотте Линк снова удалось выстроить очень сложную, но связную историю, которая едва ли может быть превзойдена по уровню напряжения». – Hamburger Morgenpost«Королева саспенса». – BUNTE«Потрясающий тембр авторского голоса Линк одновременно чарует и заставляет стыть кровь». – The New York Times«Пробирает до дрожи». – People«Одна из лучших писательниц нашего времени». – Journal für die Frau«Мощные психологические хитросплетения». – Focus

Шарлотта Линк

Детективы / Триллер
Дом лжи
Дом лжи

Изощренный, умный и стремительный роман о мести, одержимости и… идеальном убийстве. От автора бестселлеров New York Times. Смесь «Исчезнувшей» и «Незнакомцев в поезде».ЛОЖЬ, СКРЫВАЮЩАЯ ЛОЖЬСаймон и Вики Добиас – богатая, благополучная семья из Чикаго. Он – уважаемый преподаватель права, она – защитница жертв домашнего насилия. Спокойная, счастливая семейная жизнь. Но на самом деле все абсолютно не так, как кажется. На поверхности остается лишь то, что они хотят показать людям. И один из них вполне может оказаться убийцей…Когда блестящую светскую львицу Лорен Бетанкур находят повешенной, тайная жизнь четы Добиас выходит на свет. Их бурные романы на стороне… Трастовый фонд Саймона в двадцать один миллион долларов, срок погашения которого вот-вот наступит… Многолетняя обида Вики и ее одержимость местью… Это лишь вершина айсберга, и она будет иметь самые разрушительные последствия. Но хотя и Вики, и Саймон – лжецы, кто именно кого обманывает? К тому же, под этим слоем лицемерия скрывается еще одна ложь. Поистине чудовищная…«Самое интересное заключается в том, чтобы выяснить, каким частям истории – если таковые имеются – следует доверять. Эллис жонглирует огромным количеством сюжетных нитей, и результат получается безумно интересным. Помогает и то, что почти каждый персонаж в книге по определению ненадежен». – New York Times«Тревожный, сексуальный, влекущий, извилистый и извращенный роман». – Джеймс Паттерсон«Впечатляет!» – Chicago Tribune«Здешние откровения удивят даже самых умных читателей. Сложная история о коварной мести, которая обязательно завоюет поклонников». – Publishers Weekly«Совершенно ослепительно! Хитроумный триллер с дьявольским сюжетом. Глубоко проникновенное исследование жадности, одержимости, мести и справедливости. Захватывающе и неотразимо!» – Хэнк Филлиппи Райан, автор бестселлера «Ее идеальная жизнь»«Головокружительно умный триллер. Бесконечно удивительно и очень весело». – Лайза Скоттолайн«Напряженный, хитрый триллер, который удивляет именно тогда, когда кажется, что вы во всем разобрались». – Р. Л. Стайн

Дэвид Эллис

Триллер