Читаем Critical Path полностью

“Indeed. The mind boggles.” Mike held out a small black rectangle with an antennae protruding from the top. “The bomb is radio controlled. Hit the left switch to prime it, the right to let it rip. It’s got a mile range. If you have problems, there’s a manual detonation switch behind a guard on the casing.”

“I hope we don’t need the last option. Where’s the bomb?”

“Follow me. I’ll show you.”

Mike waddled back up the ramp and turned left after entering.

Charlie followed him into the gloom and up a ladder into the cockpit. A row of four basic-looking stools, with harnesses dangling above them, wrapped around the back of the cockpit. Two larger chairs, most likely for the pilots, were positioned in the middle of the cockpit. The windows were all shielded, but a light blue strip of lighting ran around the upper part of the area, providing ambient light. The thick air carried a croatoan fishy odor.

“Looks pretty basic in here,” Charlie said.

Mike smiled. “Just wait ’til you get going, amigo. You’ll be blown away.”

“That’s what I’m worried about.”

Mike stooped and grunted. He reached under the stool on the far right and patted a black case. “Make sure you take this seat. You’ll be right on top of it.”

“How long have I got after flicking the switches?”

“Two seconds. I figured you needed a quick option.”

Smart planning from Mike. If things went downhill rapidly, Charlie didn’t want to give anyone a chance to deactivate the bomb.

Footsteps banged against the metal floor below, and the stair rungs clinked as somebody ascended. Hagellan’s bulbous head poked through the hatch. “Time to say goodbye to your friends. I’ll prepare for launch.”

It climbed into the cockpit and strapped itself into one of the pilot chairs.

Mike shuffled past Charlie and descended. He looked down the hatch at his old friend wheezing to the bottom. Over three decades and he hadn’t let him down once. Always carried out the work with a smile.

Mike glanced up. “You coming or what?”

“I’ve never been one for goodbyes. You know that. Just tell them I’ll be back.”

Mike leaned around the door and looked back up. “Aimee’s here. You should say farewell to Mai at least?”

Aimee meant nothing to Charlie. Mai did, but he’d said all he wanted to say to people on the ground. “You haven’t seen the last of me, Mike. Count on it.”

Mike smiled and shook his head. He climbed a few rungs up and extended his hand. Charlie leaned down and gave it a firm shake. “I don’t doubt it. You’re like a cat with nine lives,” Mike said.

A whirring noise distracted Charlie, and he looked over his shoulder. A podium smoothly rose from the floor in front of Hagellan, and high-definition screens around the cockpit flickered into life.

He glanced back down at Mike. “Looks like the show’s on the road. Tell the others to get their asses up here.”

Mike stared up at Charlie but didn’t say a word. He wiped his left eye. This was one of the reasons Charlie hated the farewells. Outside, this was probably happening on a larger scale. Two croatoans in gleaming uniforms nudged against Mike. One pointed to the ladder and clicked.

“Keep yourself out of trouble, Mike,” Charlie said.

Mike squeezed between the two aliens and peered up from the doorway. He opened his mouth to say something, paused, lowered his head, and slipped back through the entrance.

The two aliens, visors glinting in the thin blue light, climbed the ladder. Charlie went back to his stool and tried to work out the harness.

“You would have made a good croatoan,” Hagellan said.

“And you would have made a good suitcase,” Charlie replied. The mere suggestion disgusted him and also told him that Hagellan didn’t have a clue about human thought process.

The first alien joined Hagellan by the controls and strapped itself in. The other approached Charlie and went to sit on the stool next to him.

Charlie pushed it away. “Sorry. That one’s reserved for Denver.”

It maintained its position and tried to sit down again. Hagellan let out a few rapid clicks, and all three aliens made a strange grunting noise. Were they laughing at him? Charlie wished he had a translation device. The croatoan in front of him shuffled across to the far stool, fastened its harness, and turned to look at him.

A green holographic cube appeared above the podium. Hagellan maneuvered it around and tapped its gloved hand against some of the symbols. The screens fizzed and cleared to show a brilliant two-hundred-and-seventy-degree view of the sky. The engines rumbled into life, and Charlie felt his whole body vibrate.

Denver appeared through the hatch. “What the hell is that?” He stared at the cube and glanced across to Charlie.

“Must be how he controls the thing. Everyone okay outside?”

Denver heaved himself up and sat next to Charlie. “I thought you might not come back out. Seemed to put Aimee’s nose out of joint.”

“Does she expect me to kiss her feet?”

“She said we were welcome back if we found a way home from Tredeya.”

Перейти на страницу:

Похожие книги

Утес чайки
Утес чайки

В МИРЕ ПРОДАНО БОЛЕЕ 30 МИЛЛИОНОВ ЭКЗЕМПЛЯРОВ КНИГ ШАРЛОТТЫ ЛИНК.НАЦИОНАЛЬНЫЙ БЕСТСЕЛЛЕР ГЕРМАНИИ № 1.Шарлотта Линк – самый успешный современный автор Германии. Все ее книги, переведенные почти на 30 языков, стали национальными и международными бестселлерами. В 1999–2023 гг. снято более двух десятков фильмов и сериалов по мотивам ее романов.Несколько пропавших девушек, мертвое тело у горных болот – и ни единого следа… Этот роман – беспощадный, коварный, загадочный – продолжение мирового бестселлера Шарлотты Линк «Обманутая».Тело 14-летней Саскии Моррис, бесследно исчезнувшей год назад на севере Англии, обнаружено на пустоши у горных болот. Вскоре после этого пропадает еще одна девушка, по имени Амели. Полиция Скарборо поднята по тревоге. Что это – дело рук одного и того же серийного преступника? Становится известно еще об одном исчезновении девушки, еще раньше, – ее так и не нашли. СМИ тут же заговорили об Убийце с пустошей, что усилило давление на полицейских.Сержант Кейт Линвилл из Скотланд-Ярда также находится в этом районе, но не по службе – пытается продать дом своих родителей. Случайно она знакомится с отчаявшейся семьей Амели – и, не в силах остаться в стороне, начинает независимое расследование. Но Кейт еще не представляет, с какой жутью ей предстоит столкнуться. Под угрозой ее рассудок – и сама жизнь…«Линк вновь позволяет нам заглянуть глубоко в человеческие бездны». – Kronen Zeitung«И снова настоящий восторг из-под пера королевы криминального жанра Шарлотты Линк». – Hannoversche Allgemeine Zeitung«Шарлотта Линк – одна из немногих мировых литературных звезд из Германии». – Berliner Zeitung«Отличный, коварный, глубокий, сложный роман». – Brigitte«Шарлотте Линк снова удалось выстроить очень сложную, но связную историю, которая едва ли может быть превзойдена по уровню напряжения». – Hamburger Morgenpost«Королева саспенса». – BUNTE«Потрясающий тембр авторского голоса Линк одновременно чарует и заставляет стыть кровь». – The New York Times«Пробирает до дрожи». – People«Одна из лучших писательниц нашего времени». – Journal für die Frau«Мощные психологические хитросплетения». – Focus

Шарлотта Линк

Детективы / Триллер
Дом лжи
Дом лжи

Изощренный, умный и стремительный роман о мести, одержимости и… идеальном убийстве. От автора бестселлеров New York Times. Смесь «Исчезнувшей» и «Незнакомцев в поезде».ЛОЖЬ, СКРЫВАЮЩАЯ ЛОЖЬСаймон и Вики Добиас – богатая, благополучная семья из Чикаго. Он – уважаемый преподаватель права, она – защитница жертв домашнего насилия. Спокойная, счастливая семейная жизнь. Но на самом деле все абсолютно не так, как кажется. На поверхности остается лишь то, что они хотят показать людям. И один из них вполне может оказаться убийцей…Когда блестящую светскую львицу Лорен Бетанкур находят повешенной, тайная жизнь четы Добиас выходит на свет. Их бурные романы на стороне… Трастовый фонд Саймона в двадцать один миллион долларов, срок погашения которого вот-вот наступит… Многолетняя обида Вики и ее одержимость местью… Это лишь вершина айсберга, и она будет иметь самые разрушительные последствия. Но хотя и Вики, и Саймон – лжецы, кто именно кого обманывает? К тому же, под этим слоем лицемерия скрывается еще одна ложь. Поистине чудовищная…«Самое интересное заключается в том, чтобы выяснить, каким частям истории – если таковые имеются – следует доверять. Эллис жонглирует огромным количеством сюжетных нитей, и результат получается безумно интересным. Помогает и то, что почти каждый персонаж в книге по определению ненадежен». – New York Times«Тревожный, сексуальный, влекущий, извилистый и извращенный роман». – Джеймс Паттерсон«Впечатляет!» – Chicago Tribune«Здешние откровения удивят даже самых умных читателей. Сложная история о коварной мести, которая обязательно завоюет поклонников». – Publishers Weekly«Совершенно ослепительно! Хитроумный триллер с дьявольским сюжетом. Глубоко проникновенное исследование жадности, одержимости, мести и справедливости. Захватывающе и неотразимо!» – Хэнк Филлиппи Райан, автор бестселлера «Ее идеальная жизнь»«Головокружительно умный триллер. Бесконечно удивительно и очень весело». – Лайза Скоттолайн«Напряженный, хитрый триллер, который удивляет именно тогда, когда кажется, что вы во всем разобрались». – Р. Л. Стайн

Дэвид Эллис

Триллер