If there is anything about the redoubtable Vice-Admiral Rick-over which is predictable, it must be his insistence upon the most thorough training, the most complete familiarity with operational and design procedures, the most meticulously careful engineering practice by the designers, builders, and personnel who operate nuclear machinery. A magnificent record of trouble-free operation of his nuclear power plants is one of the results. It is attained by vigilance on the part of all personnel involved—and of all of them, the most vigilant is Vice-Admiral Rickover himself.
In the case of the
Executive Officer Will Adams and I, for instance, received what we later decided was the most strenuous and yet the most satisfying period of training, testing, and qualification either of us had ever experienced. Before we were finished, we had mapped out the entire power plant of the
By the time we arrived at the Electric Boat Division of the General Dynamics Corporation, in Groton, Connecticut, to participate in the launching of our new ship, which took place on August 19, 1958, we had received the best possible training in the techniques of operating her highly complicated machinery and handling all conceivable functions and malfunctions.
As time went on, and we came to know them intimately, Adams and I developed a deep admiration for the designers of our fantastic power plant, and it is probably proper at this point to state that Lieutenant Commander David Leighton, USN, stands second only to Admiral Rickover in our appreciation of the job done. We also developed a strong regard for the officers and men of
Already, she had created difficulties because of her great size. Among the problems faced by the builders was that her huge bow blocked the space reserved for the railroad which ran just forward of the building ways. This railroad was needed to haul regular loads of ship-building supplies which were needed in the Yard. It had to be kept operating. The problem was solved by cutting away a part of the lower section of
At the other end of the ship, her stern projected so far out over the Thames River that efficient construction was not possible. Therefore, to the considerable consternation of the people on the New London side of the river, who could see only a great unfinished cavern where
One segment of the ship could not, however, be installed before the launching ceremony.