A typical day at Gioia was pretty fast paced. At the height of the air campaign, we were launching 16 aircraft on the first go and usually 14 on the afternoon go. We used a UHF/VHF-equipped Humvee as the production superintendent’s vehicle. This enabled us to talk to the pilots and “ops desk” to get aircraft status on the inbound so we could begin to line up the afternoon sorties and have technicians standing by to begin to work the inflight write-ups. We definitely had a full plate turning the aircraft from the first go to the second go.
\Photo: Using a bike to get around the flight line at Gioia
Our configuration was typically four Mk-82 low-drag bombs, two AGM-65 Maverick air-to-ground missiles, 30 mm combat mix ammunition, 14 2.75-inch rockets, two AIM-9 air-to-air missiles, chaff/flare, Pave Penny pod, and an ALQ-131 electronic countermeasures (ECM) pod. Obviously, our crew chiefs, weapons loaders, and system specialists were all busy. They worked in-flight write-ups, conducted aircraft postflight inspections, loaded munitions, and refueled—all of this had to come together in about two hours and 30 minutes. Our production superintendents orchestrated the activity on the line, and the troops hustled each and every day of the campaign to make it happen. Both the day and night crews did a remarkable job of keeping track of the frag, necessary configurations, and CSAR alert. We scrambled our CSAR-alert aircraft on the nights the F-117 and F-16 were shot down, and again on several other occasions. We took our CSAR-alert commitment very seriously, knowing that lives depended on it.
We also had to watch each of our aircraft’s phase-inspection timeline. Each A-10 must undergo a phase inspection after 100 hours of flying time to discover and repair problems that might have been missed during normal preflight and postflight inspections. We flew about 75 total hours and accomplished one 100-hour phase inspection at Spangdahlem each day at the beginning of the conflict. As the demand for airborne CSAR alert, AFAC, and A-10 strike missions grew, we were soon flying over 100 hours each day. We knew this would quickly become a problem because we were “earning back” only 100 hours per day with our current flow of one aircraft through phase. We quickly elevated the options: we needed to cut back down to below 100 hours a day, perform contingency phase inspections, or bring in enough personnel and equipment from the combat air forces (CAF) to stand up a second A-10 phase dock at Spangdahlem. We chose the third option. Those who stayed behind at Spangdahlem to perform A-10 phase inspections were just as valuable to the effort as those of us who deployed. Without the hard work and long duty hours performing these vital inspections on our A-10s, we would not have been able to keep up with our NATO taskings. Again, it was truly a total team effort, both at home station and Gioia del Colle.
Daily sustainability issues were initially challenging. We had no Air Force infrastructure to support us. Our spares packages were sparse, and any parts coming into country via premium transportation (Federal Express and DHL Worldwide Express) were subject to Italian customs inspectors. This worked well Monday through Friday, but we had no customs support over the weekend or on Italian holidays. This became frustrating when a part hit the airport on a Friday afternoon and we knew we wouldn’t see it before Monday afternoon when the delivery would be made. This was the single biggest issue that we were not able to resolve during the conflict. We learned to live with it but didn’t like it because it was often the one part we needed to return a jet to mission-capable status. We did get the luxury of a twice-weekly rotator flight back to Ramstein for ECM pod and precision measuring equipment laboratory (PMEL) support. We also used this flight to get parts and other needed items from home station, especially those short-notice items.
Looking back, I can honestly say that the only reason we were able to maintain our hectic pace was the dedicated team effort by all involved. Although it was a “pilot’s war,” I was proud to witness the support of the Air Force ground team—flight-line backshop, munitions maintenance, supply, transportation, personnel, administrative, finance, contracting, and the list goes on. They were all there to provide support—and they did it well. Their behind-the-scenes efforts were key ingredients in the success of the A-10s supporting KEZ operations from Gioia.
Getting There from Here